What does this clause imply: “The time during which there is bad weather/heavy swell or adverse current with wind exceeding beaufort force 4 and/or douglas sea state 3 will not be taken into consideration for the calculation of the performance.”
Is it -
adverse current related to ‘BF4/sea state 3’ and the bad weather is left undefined; or
the words have been inserted wrongly, i.e. placing of adverse current and bad weather needs to be swapped?
In London Arbitration 09/18, the Tribunal went with option ‘ii’. It was inconceivable that Beaufort Force 4 and Douglas Sea State 3 would apply only to ‘adverse current’ and not bad weather. Correct in my view.
Commentaires